Skip to content
ProjectMetricaProject planning & local quotes Call 855-642-0110 ☎ Start Matching →

Fill Dirt Cost per Cubic Yard

Fill dirt cost per cubic yard can look inexpensive when you only compare the raw material price, but the delivered project cost often depends just as much on trucking, minimum loads, access, spreading and compaction. For a fair comparison, ask suppliers and contractors for the same material specification and the same delivered quantity.

Prices vary widely by region, supplier, soil type and job size, so this guide focuses on the cost structure rather than pretending there is one national price that applies everywhere.

Estimate your fill-dirt quantity →

What affects fill dirt cost per cubic yard?

  • Material source: screened, unscreened, clean and engineered fill can be priced differently.
  • Order size: suppliers may have minimum quantities or different pricing for larger loads.
  • Delivery distance: trucking time and fuel can be a major part of the total.
  • Truck capacity: a small project may still incur a full-trip charge.
  • Site access: difficult unloading or long internal hauling increases labor and equipment needs.
  • Placement and compaction: a delivered pile is not the same as finished compacted fill.

Material price vs delivered price

A supplier may quote a low yard price at the yard but charge separately for delivery. Another supplier may quote a higher material price with a lower trucking charge. Compare the delivered total, not just the advertised price per cubic yard.

Simple comparisonDelivered cost per yard = total material + delivery + required fees ÷ delivered cubic yards

Also ask whether taxes, fuel surcharges or minimum-order fees are included.

Loose fill vs compacted fill

Fill dirt is commonly delivered loose, while a grading or construction plan may describe a finished compacted volume. Loose soil can reduce in volume as it is placed and compacted. That means a project needing 20 finished cubic yards may require more than 20 loose cubic yards delivered.

The correct allowance depends on material characteristics, moisture and compaction requirements. Use project or supplier guidance rather than assuming one universal percentage.

Example fill-dirt budget structure

Suppose your calculation indicates 18 loose cubic yards. Instead of asking only “what is your price per yard?”, request a quote that identifies the material, quantity, delivery charge and any minimums. If placement is included, ask whether grading and compaction are included or separate.

Cost item Question to ask
Material What type of fill is included and how is quantity measured?
Delivery Is trucking a flat fee, distance-based or included?
Minimum load Is there a minimum quantity or small-load charge?
Placement Is spreading included or is material dumped in one location?
Compaction Is compaction included and what standard is being targeted?

How quantity changes the project cost

A measurement error of only a few inches over a large area can add several cubic yards. For example, 2,000 square feet filled an extra 2 inches requires about 12.35 additional cubic yards before any compaction adjustment. That can materially change both material and trucking costs.

Use the Fill Dirt Calculator with the real area and average depth before requesting supplier quotes.

Fill dirt vs topsoil cost

Fill dirt and topsoil serve different purposes. Fill is generally chosen for building grade, filling low areas or creating bulk elevation, while topsoil is intended for the upper growing layer. Do not substitute one for the other based only on price.

Our Fill Dirt vs. Topsoil guide explains the planning difference in more detail.

Delivery access can be a major cost factor

Before ordering, identify where a dump truck can safely unload. Narrow driveways, overhead wires, weak pavement, steep grades and soft ground can limit access. If the truck cannot reach the work area, material may need to be moved by wheelbarrow, skid steer or other equipment.

Do you need screened fill?

Different projects require different materials. Unscreened fill may contain larger particles or debris depending on the source, while screened or specified fill may have tighter requirements. Ask what the supplier means by “fill dirt” rather than assuming every load is equivalent.

Compaction affects both quantity and labor

Placing a thick layer all at once is not the same as building compacted fill in controlled lifts. Projects with structural or drainage requirements may need specific procedures and professional guidance. The calculator is useful for volume planning but is not an engineering specification.

Common fill-dirt budgeting mistakes

  • Comparing only material price per yard.
  • Ignoring delivery and minimum-load charges.
  • Assuming loose delivered volume equals finished compacted volume.
  • Ordering before confirming truck access.
  • Using topsoil pricing for a fill-dirt project or vice versa.
  • Estimating depth from one location on an uneven site.

Frequently asked questions

Why does fill dirt cost per cubic yard vary so much?

Local material supply, hauling distance, order size, material specification and site access can all change the delivered cost.

Is delivery usually included in fill dirt pricing?

Not always. Some suppliers quote material separately while others provide a delivered price. Ask for the total cost to your property.

How do I estimate how many yards I need?

Multiply area by average fill depth to get cubic volume, then convert cubic feet to yards by dividing by 27. Account separately for any compaction requirement.

A good quote starts with a good quantity estimate. Calculate the project first, then compare suppliers using the same delivered quantity and material description.

Optional next step

Request a local grading or fill quote

Complete 3 quick steps to check local availability.

100% Free No Credit Card Required No Obligation to Hire

How it works
  1. Tell us what you needAnswer a few quick project questions.
  2. We check local availabilityMatching is based on your ZIP and project details.
  3. Available providers may contact youCompare your options and decide what works for you.
1 Project 2 Details 3 Contact
Step 1 of 3

What kind of project is it?

Choose the service details and enter the five-digit project ZIP code.

Step 2 of 3

A few project details

Confirm who can authorize the work and add a short project description.

Step 3 of 3

Where can professionals reach you?

Use the contact details for the property where the project is planned. This usually takes about a minute.

Your request stays focused on this project
  • Your address helps check local service availability and is not posted publicly.
  • Submitting is free and does not require you to hire anyone.
  • Your details are used to process and route the home-service request described here.

✓ 100% Free ✓ No Credit Card Required ✓ No Obligation to Hire ✓ Consent Record Captured

Consent record powered by TrustedForm. Your consent session is independently recorded when you submit this request.

Notice at Collection: We use the information you provide to process and route this project request to participating service providers. Privacy Policy · Your Privacy Choices

How your information is used

Notice at Collection: ProjectMetrica collects the contact, project, device/source and consent information entered or generated with this request to provide contractor matching, document consent, prevent fraud and operate the service. If an eligible match is available, you direct us to disclose the request to participating service providers and platform partners, including WiserLeads/homeyou or Titan Lead Group, for the home-improvement project you selected. The consent session is independently recorded. See the Privacy Policy and Your Privacy Choices.

By submitting, you confirm that you are at least 18 years old and that the information you provided is accurate.

Your request may be sent to participating home-improvement providers when a qualifying match is available.