Skip to content
ProjectMetricaProject planning & local quotes Call 855-642-0110 Compare local quotes

Topsoil for 1000 Square Feet: How Much Do You Need?

TopsoilSee how topsoil depth changes cubic yards for a 1,000-square-foot lawn or bed.

For 1,000 square feet, every inch of topsoil depth requires about 3.09 cubic yards before allowance. Choosing the correct finished depth is therefore more important than rounding the final order.

Topsoil quantities by depth

Depth Theoretical volume
1 inch 3.09 cubic yards
2 inches 6.17 cubic yards
3 inches 9.26 cubic yards
4 inches 12.35 cubic yards
6 inches 18.52 cubic yards

Add allowance deliberately

Uneven ground, grading and settlement may justify extra material. At three inches, adding 10% changes 9.26 yards to about 10.19 yards. Discuss finished depth and settlement with the supplier.

Match depth to the use

Topdressing an established lawn, starting a new lawn and filling a planting bed are different projects. Review how deep topsoil should be before ordering.

Calculate topsoil for your exact area →

Verify the project specification

Local conditions, product requirements and project rules can change the final quantity or installation method. For additional background, consult USDA Web Soil Survey, along with the selected manufacturer and local authority.

Optional next step

Request a local soil delivery quote

Complete three short steps to check for available local professionals.

Free to submit No purchase required

How matching works

ProjectMetrica helps route your soil / mulch / rock delivery request to participating platform partners or service providers when an eligible match is available.

  • Availability depends on ZIP code, service and project details.
  • ProjectMetrica is not the contractor and may receive compensation for an accepted request.

ProjectMetrica collects this request and may share it with participating service providers and platform partners for the home-improvement project you selected. The consent session is independently recorded. See the Privacy Policy.

1 Project 2 Timing 3 Contact
Step 1 of 3

What kind of project is it?

Choose the service details and enter the five-digit project ZIP code.

Step 2 of 3

When are you planning the work?

These details help make the request more relevant. No availability check is sent yet.

Step 3 of 3

Where can professionals reach you?

Use the contact details for the property where the project is planned. This usually takes about a minute.

Your request stays focused on this project
  • Your address helps check local service availability and is not posted publicly.
  • Submitting is free and does not require you to hire anyone.
  • Your details are used to process and route the home-service request described here.

By submitting, you confirm that you are at least 18 years old and that the information you provided is accurate.

Your request may be sent to participating home-improvement providers when a qualifying match is available.