The “3/4-inch” label describes nominal stone size, not weight per cubic yard. Rock type, gradation, fines and moisture determine density, so calculate project volume first and use the supplier’s conversion.
Find compacted cubic yards
Multiply square feet by depth in inches and divide by 324. A 600-square-foot area at three inches is about 5.56 cubic yards before allowance.
Convert with product density
If the supplier specifies 1.4 tons per cubic yard, 5.56 yards equals about 7.78 tons before allowance. Do not treat 1.4 as universal; enter the figure for the actual product.
Account for compaction and delivery
Confirm whether the design depth is compacted and ask how much loose aggregate is needed. Check truck capacity, delivery minimums and a safe dumping location with the supplier.
For paver installations, compare the best base materials for pavers.
Calculate crushed stone yards and tons →
Verify the project specification
Local conditions, product requirements and project rules can change the final quantity or installation method. For additional background, consult Concrete Masonry & Hardscapes Association resources, along with the selected manufacturer and local authority.
Request a local gravel project quote
Complete three short steps to check for available local professionals.
Free to submit No purchase required
ProjectMetrica helps route your gravel / pea gravel / fill work request to participating platform partners or service providers when an eligible match is available.
- Availability depends on ZIP code, service and project details.
- ProjectMetrica is not the contractor and may receive compensation for an accepted request.
ProjectMetrica collects this request and may share it with participating service providers and platform partners for the home-improvement project you selected. The consent session is independently recorded. See the Privacy Policy.